Grupo Col贸n Gerena: Facility Planning
| LOCATION: |
San Juan Metropolitan Area |
| CLIENT: |
Grupo Col贸n Gerena |
| DESIGN: |
2020-2021 |
| CONST. COST: |
|
A+UD was commissioned by GCG to assist in defining programmatic requirements of the GCG group and analyzing possibilities to rearrange their distribution warehouse, integrate other operational and administrative uses or establish metrics to consider a new facility. Planning effort remains on-going as other disciplines integrate analytical or technical data to complete a thorough planning report.