Pan Pepin- New Employee Parking (Phase I) & New Manufacturing Plant A (Phase II)
Phase I of the Pan Pep铆n Master Plan commenced a transformation in the Pan Pep铆n campus to improve operational relationships through a physical revolution of its physical fabric. Enabling the relocation of the original lot, the employee parking gave ground to Phase II, the largest component of the Master Plan. Plant A encompasses approximately 39,150sf of manufacturing area, a 3,000sf mezzanine and a 卤55,000 sf distribution platform and the most advanced (bakery) production line in the USA at time of completion. A+UD also designed and coordinated all MEP & Controls design drawings for the referenced line designed by AMF.