Pan Pepin- New Employee Parking (Phase I) & New Manufacturing Plant A (Phase II)

LOCATION:Minillas Industrial Park, Bayamón
CLIENT:Pan Pepín Inc.
DESIGN:2015-2018
CONST. COST:$1.8 MM (Phase I), $23MM (Phase II)

Phase I of the Pan Pepín Master Plan commenced a transformation in the Pan Pepín campus to improve operational relationships through a physical revolution of its physical fabric. Enabling the relocation of the original lot, the employee parking gave ground to Phase II, the largest component of the Master Plan. Plant A encompasses approximately 39,150sf of manufacturing area, a 3,000sf mezzanine and a ±55,000 sf distribution platform and the most advanced (bakery) production line in the USA at time of completion. A+UD also designed and coordinated all MEP & Controls design drawings for the referenced line designed by AMF.

Pan Pepin- New Employee Parking (Phase I) & New Manufacturing Plant A (Phase II)

Phase I of the Pan Pepín Master Plan commenced a transformation in the Pan Pepín campus to improve operational relationships through a physical revolution of its physical fabric. Enabling the relocation of the original lot, the employee parking gave ground to Phase II, the largest component of the Master Plan. Plant A encompasses approximately 39,150sf of manufacturing area, a 3,000sf mezzanine and a ±55,000 sf distribution platform and the most advanced (bakery) production line in the USA at time of completion. A+UD also designed and coordinated all MEP & Controls design drawings for the referenced line designed by AMF.
LOCATION: Minillas Industrial Park, Bayamón
CLIENT: Pan Pepín Inc.
DESIGN: 2015-2018
CONST. COST: $1.8 MM (Phase I), $23MM (Phase II)